ATMORE WEST FACILITY

11-23-067-18W4M              WM#182     

White Swan’s Atmore west facility is located 2km east of Grassland Alberta, this facility is a complete waste processing and disposal facility designed for high volume daily deliveries of all production, turn around, hydro-vac, drilling and completion waste. With a superior design focused on eliminating wait times for transporters the Atmore facility offers regional producers with a high volume disposal option capable of accepting, processing and disposing of volumes in excess of 3000m3 daily.

The Atmore west facility is equipped with 4 disposal wells and one of the largest vacuum truck receiving pads in Alberta. White Swan is nearing the completion of its first waste cavern at this site, the cavern is scheduled to be converted to disposal in Q1 of 2020 once washing is complete.

This facility boasts a WRAP (Waste Receivers Assessment Program) audit score of 93.59% and its disposal wells have been tested among the top injection rates in the province.

Contact:

Facility Managers:

Brad Charland & Dean Steel

780-404-6799

Area Dispatch Line:

780-404-7299

Screen Shot 2019-11-27 at 4.21_edited.jp

© 2019 by White Swan Environmental Ltd.